2022.03.31 EPL_Facility Assessment Report

25 Recommendations: A8.01 Provide new, accessible sink in the staff break room. A8.02 Modify all restrooms for accessibility, including new appropriately sized stalls, grab bars, fixtures, sinks, door hardware, and door approaches. Consider the addition of automatic doors at public restrooms. Photo 49 Most drinking fountains are too tall or in recessed openings, therefore they are not accessible Photo 50 The door approach and push plate/hardware are not accessible Photo 51 The designated accessible curb cut is not flush with the pavement Photo 52 The raised floor poses tripping hazards and ramp slope exceeds accessible guidelines

RkJQdWJsaXNoZXIy NDQ4NTQ1